- Name of Project: VESSEL UPGRADE
- Scope of Work: FEASIBILITY STUDY ENGINEERING - LIST OF MOST RELEANT UPGRADE WORKS:
-
- Extension of the deck, abaft of accommodation, at the same elevation of the forecastle deck. The consequent mezzanine deck rated for strenght of 5t/dqml - No enclosed volumes, no variation of GT.
- Extension of the bulwark plating from main deck to new mezzanine deck or to cargo rails level
- Additional Hipap Trunking
- Replacement of the existing provision crane, fixed boom type, with retractable knuckle type.
- Full package of Stability information (including inclining test).
- Sea-Ballast-Water-FREE (no BWT system - BW Convention exempted).
- Sea-fastening of diving equipment could be installed according to the deck layout (to be evaluated)
- New davit for FRC to be installed at the same location where the existing is placed
- DP2 FMEA, Sea DP Trials
-
- Client: GLOMAR OFFSHORE