- Name of Project: Sentinel Refitting
- Scope of Work: Design of conversion: structural calculation of new strenght deck , DP 2 upgrade, class drawings, stability checks and booklet, piping systems, cost budgeting and yard superintendance.
General: Design of conversion (structural calculation and drawings, stability checks and booklet, piping systems), cost budgeting.
Machinery: Procurement ad installation of main engines, thrusters.
Steelwork: Main deck strengthening 5 t/sqm, aft bridge for DP operations, accommodation refitting.
Dynamic Positioning: FMEA study, consultancy during upgrade form DP1 to DP2 with relevant reports of non-conformities and trouble shooting. Issuance of the FMEA TEST PROGRAMME and coordination of the sea proving trials, including interface with Classification Society both for approval of documents and execution of surveys.